Blast notification on the road upgrade to dual carriagway between Windhoek and Okahandka; TRI/6 section 4A
The Roads Authority wishes to notify all members of the public and, in particularly, road users of the blasting operations scheduled to take place on TR1/6 (WindhoekOkahandja road), between kilometer 15.8 and kilometer 20.1 on Wednesday, 16 May 2018 at 12:00 – 13:00 and again on Saturday 19 May 2018 at 15:00 – 16:00 on Kilometer 2.2.
The road will be closed-off with the assistance of NAMPOL on the dates indicated above for approximately 30 minutes (from 10 minutes before till 20 minutes after) during the blasting period. Blast notification signs are in place with indications of the blasting date and time.
All motorists are kindly requested to take note of the temporary closure and to plan their journeys accordingly. In addition, we would like to appeal to the road users to observe the road signs at all times during the construction of this project and refrain from driving on sections that are currently under construction. We apologize for any inconveniences this may cause.